“Replace” = ambiguous pipeline easement

March 25, 2015

AngusIn Angus Chemical Co. v. Glendora Plantation, Inc., an industrial facility had an easement that gave it “the right to construct, maintain, inspect, operate, protect, alter, repair, replace and change” a pipeline.  No. 14-30416 (March 24, 2015).  The company plugged and abandoned its original 12″ pipeline in favor of a new 16″ one.  The key appellate issue was whether the right to “replace” a pipeline allowed the company to simply substitute one pipeline for another, or whether it also “impl[ied] a corresponding duty to remove” the old one.  The Fifth Circuit found the term “replace” was ambiguous in this context, and that there was a material fact issue in the extrinsic evidence about which meaning should prevail.  Therefore, it reversed the district court’s summary judgment in favor of the chemical company.  This topic — the role of extrinsic evidence in contract disputes — was most recently before the Court in a major case in the “Whoomp! There it is” litigation, and as detailed in a link from that post, frequently leads to disagreement between the trial courts and the Fifth Circuit.

Follow by Email
Twitter
Follow Me